Generator Interconnections

This statement of Shenandoah Valley Electric Cooperative (SVEC) Distributed Resource Integration Requirements provides the requirements for interconnection of member-owned generation facilities planned for interconnection with SVEC transmission and distribution facilities.

The requirements will be reviewed annually and updated as necessary.

The document is available here:

SVEC Distributed Resource Integration Requirements

UA-125736785-1