Availability
Available in all territories served by the cooperative, subject to the terms and conditions of the cooperative on file with the Virginia State Corporation Commission.
The power cost adjustment is a pass-through cost from SVEC’s wholesale provider, Old Dominion Electric Cooperative. It makes up roughly 70% of a member’s monthly bill, and can fluctuate throughout the year. SVEC has no control over this cost.
Power Cost Adjustment Rider (PDF)
PCA Billing Factor
| Month | Billing Factor |
|---|---|
| October 2026 | $0.03411 |
| September 2026 | $0.03411 |
| August 2026 | $0.03411 |
| July 2026 | $0.03411 |
| June 2026 | $0.03411 |
| May 2026 | $0.03411 |
| April 2026 | $0.02299 |
| March 2026 | $0.02299 |
| February 2026 | $0.02299 |
| January 2026 | $0.02299 |
| December 2025 | $0.02818 |
| November 2025 | $0.02818 |