Coincident Peak Load Control Rider LCR-1

Availability

Available as an option on a voluntary basis to qualifying Consumers for accounts served on current and subsequent iterations of Schedule B-13 and/or Schedule LP-13. To qualify, the load must have an effective Schedule B and/or Schedule LP Billing Demand in excess of 100 kW. All provisions of Schedule B and/or Schedule LP iterations in effect and as applicable will remain in effect except as modified by this rider.