Generator Interconnections

This statement of Shenandoah Valley Electric Cooperative (SVEC) Distributed Resource Integration Requirements provides the requirements for interconnection of member-owned generation facilities planned for interconnection with SVEC transmission and distribution facilities.

The requirements will be reviewed annually and updated as necessary.

The document is available here:

SVEC Distributed Resource Integration Requirements

 

Ready to submit an SGI project?

If you are an interconnection customer who is ready to begin the pre-application process for a Small Generator Interconnection (SGI) with SVEC’s distribution system, please visit the applicable code section for a pre-application form and requirements on this website: https://law.lis.virginia.gov/admincode/title20/agency5/chapter314/section170/